12/11/2022
Đồng Nai

Project

DONG NAI METAL CASTING MOLD MANUFACTURING COMPANY

  • Location: Loc An Binh Son Industrial Park - Dong Nai
  • Time: 2022
  • Equipments: 1 LPG Tank 30 Ton, 1 vaporizer 600kg/h and other equipments.

LPG systems installed by DATA Energy at factory include:
– 54m3 LPG tank, one vaporizer with capacity of 600Kg/h.
– Technological equipment for LPG input line from pump head to tank.
– Technological equipment, pipes from 54m3 LPG tank to casting machine area and painting area of the factory.
– Flow meter cluster system for each casting area, painting area.
– Equipment and pipes for cooling water lines for tanks.
– The electrical system for the vaporizer, the electrical system for controlling LPG station equipment.

DATA Energy has also equipped a cooling, safety and fire protection system for the plant in accordance with the fire prevention and fighting regulations of the oil and gas industry. On October 6, 2022, the project officially loaded gas and supplied gas to the plant to serve the needs of testing equipment before the plant officially went into operation.