Service Maintaining and repairing the pressure reduction system (PRU)

DATA ENERGY COMPANY LIMITED (DATA Energy)

  • Supply LPG, CNG, LNG.
  • Consult, Design, Install Industrial Gas System.
  • Invest Gas System (LPG, CNG, LNG) for the factory.

Images Reality

Service Process

1. General inspection of CNG station foundation, fence, signs of corrosion;
2. Check safety signs around the station; Check electrical cabinet.

1. Check the power cabinet and control cabinet

1. Check the heating water pump; Check the heating element (resistor); Check the operation of the solenoid valve;
2. Check the operation of the electrode (water level indicator); Check the boiler backup water tank.

Check female head and coupling wire; Check pressure gauge on filling column; Check coupling wire support foot; Check ground clamp.

1. Check the emergency shut-off system, Check the filter; Level 1 pressure regulator; Level 2 pressure regulator.
2. Check for leaks in pipes and joints; Check the pressure gauge and temperature on the system (mechanical);
3. Check the tightening force at the high-pressure tube joints; Check the pressure of the nitrogen gas tank.

1. Check the inspection period of the equipment
2. Calibrate the measuring equipment